Search Here

Custom Search

Thursday, 14 July 2011

TESTING AND PERFORMANCE ( TESTING AND PERFORMANCE )

TESTING AND PERFORMANCE :-


TESTING AND PERFORMANCE:-

Testing is the last but not least stage of our project to check the effectiveness of cyclone separator and to know whether it work efficiently or not we conduct two type of test on diesel engine

1st  :

In this test we run the diesel engine at no load and some load  for approximate specified time 5 minute. And collect the carbon through a exhaust pipe .now  we attach the cyclone separator at the end of exhaust pipe after this as describe above we run diesel engine at same load and time and collect particles that separate in collector. By comparing  the both weight of carbon particles for same time we know idea about its performance. 

2nd  :-

In this test we run diesel engine at various  load  like at no load ,5 kg ,10 kg ,15 kg and full load.Now first we collect particles on “ FILTER PAPER” for 1 minute without use of  separator and then by using cyclone separator we collect particles on “ FILTER PAPER”  for  same load and time as describe as above.  By comparing  these reading as shown in figure we check it’s performance .

CONCLUSION ( A PRESSURE POWER GENERATOR )

CONCLUSION:-    

 From the result it is seen that performance of the cyclone separator is coming satisfactory. The aim of this project to use the same at the exhaust pipe of diesel engine operated 3-wheeler used for passenger and goods, which when are overloaded gives lot of dense smoke from the engine. To overcome this condition if the silencer of the engine is replace by this small cost unit will minimize the level of smoke, hence the environmental pollution while  conducting various testing on diesel engine through cyclone separator we can know that by increasing length of conical portion and reducing diameter the efficiency can increase.